Wiring

Internal Electrical Wiring

Safe, code-compliant wiring for homes, villas, commercial and industrial buildings — new construction or renovation.

Internal electrical wiring
100+ ProjectsDelivered Nationwide
Wiring

Wiring Done Right, the First Time

From a single home to a multi-storey commercial building, we wire every circuit to code — correctly sized for the property's actual load, with earthing and circuit protection built in from day one, not added as an afterthought.

  • Residential, commercial & industrial wiring
  • New construction & electrical renovation
  • Wired to IS 732 electrical safety code
  • Load-calculated circuit protection
Get a Free Quote

What We Wire

Every Type of Property

01

Residential Wiring

Complete home wiring — circuits, distribution boards and fixtures.

02

Villas

Multi-zone wiring for independent houses & villas, including outdoor circuits.

03

Commercial Buildings

Office, retail & hospitality wiring sized to load and fit-out plans.

04

Industrial Wiring

Heavy-load and machinery wiring for factories & industrial plants.

05

New Construction

First-fix & second-fix wiring coordinated with your build schedule.

06

Electrical Renovation

Rewiring & upgrades for existing properties, done with minimal disruption.

How It Works

From Load Plan to Switch-On

  • 1. PlanLoad calculation & circuit layout
  • 2. First FixConduiting & cable routing
  • 3. Second FixFixtures, switches & panel connection
  • 4. TestEarthing/RCD check & final handover

Renovation or New?

Signs Your Property Needs a Rewire

Frequent trips or flickering lights

Breakers tripping often, or lights dimming when an appliance switches on, usually points to overloaded or ageing wiring.

Property is 15-20+ years old

Older wiring often lacks earthing/RCD protection required by current safety codes — worth a check even with no visible faults.

All wiring is done to IS 732 electrical safety code, with correctly sized circuit protection for the property's actual load.

Common Questions

Electrical Wiring — FAQs

Do you handle wiring for new construction as well as renovations?

Yes — we wire new-construction homes, villas, commercial and industrial buildings from the ground up, and also handle electrical renovation of existing properties.

Is your wiring work compliant with electrical safety codes?

Yes — all wiring is done to relevant Indian electrical safety codes and standards, with load calculations and circuit protection sized correctly for the property.

Can you wire a property that will later add solar or an EV charger?

Yes — we can plan and pre-wire a property for future solar or EV charging integration, saving rework later.

How long does wiring a typical home or villa take?

A standard 2-3 BHK home typically takes 5-10 working days for first and second fix combined, depending on the number of circuits and fixtures. Larger villas and commercial buildings are scheduled around your construction timeline and confirmed after the site survey.

Do you provide earthing and surge/RCD protection as part of the wiring?

Yes — proper earthing and RCD (residual current device) protection are built into every wiring job by default, not offered as an add-on, since they are essential for occupant safety and code compliance.

What is included in the wiring quote — materials, labour, or both?

Our quotes cover both materials (cables, conduits, distribution boards, switches/sockets) and labour for a complete, tested installation. Since costs vary with property size and finish level, share your layout via our contact page or call +91 9473103950 for an accurate quote.

Get Started

Get Your Property Wired Right

Tell us about your property and timeline and we'll put together a wiring plan.

Get Your Free Quote
Let's Connect