Charge on Solar, Not on the Grid
As EV adoption grows, on-site charging backed by solar cuts your running cost to near zero and future-proofs your home, office or commercial property. We handle the complete scope — site survey, civil and electrical infrastructure, AC/DC charger installation, and commissioning — with smart load management to avoid grid overload.
- AC & DC fast-charging options
- Solar-integrated for near-zero running cost
- Site survey, civil & electrical infrastructure included
- Smart load management & scheduling
- Fleet & multi-point charging setups
How It Works
From Survey to Live Charging
- 1. SurveySite visit & parking layout review
- 2. DesignAC/DC point selection & solar integration
- 3. InstallCivil, electrical & charger installation
- 4. CommissionTesting, app setup & handover
Scope of Work
What We Deliver
AC Chargers
Slower overnight charging — ideal for homes, offices and long-stay parking.
DC Fast Chargers
Full charge in under an hour — built for fleets and high-traffic commercial sites.
Site Survey
Load assessment and parking layout review before any work begins.
Civil Infrastructure
Foundation, cable trenching, bollards and parking-bay marking.
Electrical Infrastructure
Wiring, metering and load management sized to your charger count.
Installation
Charger mounting and connection by our own trained crews.
Commissioning
Full testing before handover, with app/usage setup included.
Maintenance
Ongoing servicing and support to keep chargers running reliably.
Planning Your Setup
AC or DC? How Many Points?
Home, office or overnight parking
An AC charger is usually enough — vehicles are parked for hours, so a full charge overnight doesn't need fast-charging speed, and AC units cost less to install.
Commercial, fleet or high-traffic site
A DC fast charger fits vehicles that need a quick top-up and move on — retail parking, highway stops, or fleet depots on a tight turnaround schedule.
As a rough guide, plan roughly 1 charging point per 8-10 parking bays for shared/commercial parking — we'll confirm the right count and mix during your site survey based on expected vehicle turnover.
Common Questions
EV Charging Stations — FAQs
Can an EV charging station be powered by solar?
Yes — we integrate the charging point with your existing or a new solar system, so daytime charging draws largely from solar generation, cutting your running cost close to zero.
What is the difference between AC and DC charging?
AC charging is slower and suited to overnight home or office charging. DC fast-charging delivers a full charge in under an hour and suits commercial sites, fleets and high-traffic locations.
What civil work is required for a charging station?
Depending on the site, civil work can include a charger foundation/plinth, cable trenching, bollards and parking-bay marking. We assess and scope this during the site survey before installation.
Do you install charging points for apartments, RWAs or commercial fleets?
Yes — we handle residential, RWA/society, office and commercial fleet installations, including approvals, common-area wiring, individual metering and multi-point load management.
How long does it take to install an EV charging station?
A single home or office AC charger point is usually installed in 1-2 days once electrical infrastructure is ready. Multi-point commercial and fleet installations take longer and are scheduled after the site survey based on charger count and civil work required.
Do I need approval from my electricity provider or society before installing a charger?
Home installations typically need a load-sanction check with your DISCOM if the charger increases your sanctioned load, and RWA/society approval for shared parking. We guide you through the relevant approvals as part of the installation process.
Get Started
Add EV Charging to Your Site
Tell us your vehicle count and parking layout and we'll design a charging setup to fit.
Get Your Free Quote